SPECIFICATION
INTERNAL
Reception
New welcome reception and full height atrium. This area comprises new porcelain floor tiles and new feature polished plaster wall linings, along with timber balustrades and timber rib ceilings.
Café
New café lounge with views and external seating onto Loch Ross and engineered HW timber floors boards to the café area.
Roof Terrace
Shared roof terrace with kitchen and external seating with views over Loch Ross and Park.
WCs
– Ground floor: new No. 13 unisex ‘superloo’ type WCs within WHB. Porcelain floor tiles, full height dry lined walls with tiled wall finishes and laminated doors.
– Upper floors: Female: 17 wcs plus 3 accessible female WC. 11 male WCs plus 3 males accessible WCs and 9 urinals. New porcelain floor tiles with SGL cubicles and solid surface wash hand troughs with tiled splashbacks, feature mirrors and wall lamps.
Showers and Changing Facilities
– 5 female and 5 male individual showers along with 1 male and 1 female enclosed WC within the changing rooms. (Provision to BCO guidelines 1:100 staff).
– Each changing room will have a vanity unit with hair drying stations and towel provision.
– 48 lockers in each changing room (plus 10 with bike enclosure) (Provision to BCO guidelines 1:10 staff).
– 1 accessible shower.
– 1 accessible WC.
– Dedicated garment drying room.
Office Areas
New carpet tile with exposed soffit and services. New vertical acoustic ceiling baffles with SAS metal ceiling rafts.
EXTERNAL
- New external LED lighting.
- New signage and wayfinding.
- New roof top garden and planting.
- Idyllic external seating overlooking Loch Ross.
- 104 enclosed bike racks with another 20 external Sheffield type bike stands. A repair stand will be provided within the secure bike enclosure together with additional lockers (10) over and above the end of trip provision.
- 304 on site parking spaces with 20 EV charging points.
(parking ratio – 1:268)
M&E
- All electric building providing space heating/cooling utilising energy efficient heat pumps.
- Energy efficient LED luminaires throughout c/w energy saving controls i.e. PIR and Daylight Control.
- Energy metering and monitoring throughout for each suite and large electrical loads.
- Underfloor busbar throughout office floorplates providing fit out flexibility.
- High speed network connection.
- Photovoltaic panels installed on roof for electrical demand response.
- 2 new 13 person lifts finished in linen pattern stainless steel, laminate panel side walls and tiled floor. All visual, audible and tactile features as necessary to meet current disabled access guidelines.
- High speed network connection.
- Photovoltaic panels installed on roof for electrical demand response.
- 2 new 13 person lifts finished in linen pattern stainless steel, laminate panel side walls and tiled floor. All visual, audible and tactile features as necessary to meet current disabled access guidelines.
ESG
- EPC A.
- High quality contemporary design using sustainable materials.
- Social/event spaces within café and roof terrace available for tenants.
- Active travel entrance.
- Network of green routes: railway stations, tram stops and bus stops nearby.